• Squamish-Reporter-Feb-13-2026.png
  • Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
  • About Us
  • Advertise
  • Send Story Ideas & Tips
  • Contact
  • News Alerts
The Squamish Reporter

The Squamish Reporter

Follow us

Local News from Squamish and Sea to Sky Region

Sunday February 15, 2026 Your gateway to the Sea to Sky corridor
  • Home
  • Squamish
  • Sea to Sky
  • BC/Canada
  • Life
  • Support Us
  • Dynamic_.jpg
  • JayDever-Small-01.jpg
  • HCF-580x340-1.jpg
  • Screenshot-2026-02-08-at-1.44.46-AM.png

Expect delays on Lions Gate bridge tonight, consider alternative routes

November 7, 2019 11:30am

Drivers are advised that single-lane alternating traffic will be in effect from 10 p.m. on Thursday, Nov. 7, to 5 a.m. on Friday, Nov. 8, 2019, for joint and bearing repairs on the Lions Gate Bridge.

The sidewalks will remain open for pedestrians and cyclists. However, drivers should expect delays during this period and may want to consider an alternative route.

Future lane closures will be required to complete the repairs, which will be confirmed and communicated in advance of the work.

Additionally, electrical maintenance is required on some of the overhead signs, which should be completed by the end of November.

For the most up-to-date highway travel information, check @DriveBC on Twitter and DriveBC.ca.

Share

Share

[addtoany]

Manoomin Collective brings Indigenous cultures together in Squamish

CapU Squamish Campus rolls out 7 Summer Program Intensives

Squamish volunteers upgrade popular Wonderland Trail

https://www.squamishreporter.com/wp-content/uploads/2023/10/Nesters-Sean-Jordan.jpg

Primary Sidebar

  • Techmobile_1.jpg

Footer

  • About Us
  • Advertise
  • Privacy
  • Terms & Conditions
Top Copyright ©2020 The Squamish Reporter. All Rights Reserved squamish reporter logo